CAEC Pratville Warehouse

Design-Build. Pre-Engineered metal building with complex site development considerations, including the partnership with the Industrial Park Development plan, as well as to allow for future expansion of the development. Ideal for storage and logistics with “super-flat” FF/FL tolerances on the slab.

Central Alabama Electrical Cooperative (CAEC)

Share This Project